Options review report
An options review report might be prepared following an options appraisal exercise, to help the client select their preferred option from a range of possibilities. A project brief for the preferred option can then be prepared so that consultants can be appointed to begin the design process.
The options review report might contain:
- A general description of the options.
- Diagrammatic sketch layouts.
- The overall consequences of each option for the client's operations.
- Assessment of compatibility with the strategic brief and business case.
- Assessment of the overall feasibility of each option.
- Potential for future-proofing.
- Planning permission issues (including the potential requirement for an environmental impact assessment).
- Sustainability considerations.
- Impact on the local community and environment.
- Third party dependencies.
- Value management exercises.
- Whole-life costs with a rudimentary assessment of costs/sqm, configuration and servicing.
- Time-frames, phasing and key milestones.
- Procurement route.
- Project risks.
- Recommendations.
It may include drawings, massing models and other material that the client finds easy to assess against the strategic brief, as well as technical assessments. Wherever possible this information should be prepared in a form that is easy to interrogate, compare and test against the strategic brief and should draw on data and sources that are being managed in a consistent way. Information should be stored and named in a way consistent with the long-term project and operational needs.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.